DescriptionHi Sheila

Here is BFX-AT100 Manufacturing Specification draft version.
Please review and give feedback.
I think test, quality, factory side review is likely to be needed.

Note 1. Some of items(yellow marked) will be discussed separately.

Note 2. This is not the final release version. It will be released v1.0 based on this draft version.


Thanks
SON
TagsMPS-01
Attach Tags

Relationships

related to 0000814 closed(Sales) Miya Wang RMA Specification for BFX-AT100 

Users monitoring this issue

User List (ALTech) BY Lee , (ALTech) Hyunsik Kim , (ALTech) JW Kim , (ALTech) Lonnie Kim , (ALTech) Philip , (ALTech) SH Son , (ALTech) Sophie Lee , (ALTech) Sun Choul Joung , (ALTech) SY Yoon , (MFG) An Tran , (MFG) Ben Trinh , (MFG) Yuri Ruan , (PM) Dennis Lu , (PM) Sheila Tu , (PM) Tiffanie Lai , (Sales) Miya Wang

Activities

(ALTech) SH Son

2019-07-04 13:18

developer  

(PM) Sheila Tu

2019-07-04 13:52

developer   ~0002825

Hi SH, thank you for your sharing.
I'll let all of our members to check the file and feedback you soon.
 
However,
For 2.5.3 and 2.5.4
I cannot say FXN will follow your requirement because we're still surveying the possibility at this moment.
I'll separate this matter to discuss by email.

For 4.2
The AQL that we defined in the agreement is 1.0. I attached the detail information for your reference.
inspection.jpg (304,811 bytes)

(ALTech) SH Son

2019-07-15 14:19

developer   ~0002832

@Sheila Tu

I will release this specification initial version until this week. And will be applied from the next production.
So, please give me the FXN feedback by this week (0000468:0002019.07.19)

and, here is updates.
2.5.3 Carton packing
 -> It is customer's requirement.
2.5.4 Cartons stacking method at pallet packing
 -> We are discussing with customers. ALT wait for customers confirmation.
4.2 AQL
 -> Change the AQL Level 0.65 to 1.0

thanks
SON

(ALTech) SH Son

2019-07-24 17:47

developer   ~0002861

@Sheila Tu
First of all, SKB and ALT agreed this spec and criteria.

ALT is released the manufacturing spec and inspection criteria for mess production.
So, please applied next MP.

Please let me know if there are items that are difficult to apply to the next production.

Thanks
SON

(ALTech) SH Son

2019-07-24 17:51

developer   ~0002862

update the Attachment#4_OBA Inspection report_Rev1.0.pptx

(ALTech) SB Park

2019-07-25 12:55

developer   ~0002866

@ Henry

I update the agenda of Eagle 9K.
Agenda_9K_Product.xlsx (235,367 bytes)

(PM) Sheila Tu

2019-07-25 18:01

developer   ~0002872

*Manufacturing Specification
Page 3.
1. Need ALT help to list S/N range on PO.
2. We don't think it's necessary to inform FW version before every production because the only one who has the right to change FW version is SKB.
   The process to change FW version is "SKB inform ALT, and ALT informs FXN".
3. According to the flow chart, ALT will review the production documents then approve to ship out.
   But the current process is "FXN to ship out after we finish the production. FXN also will provide the production document at the same time"
4. According to "Attachment 4 OBA Inspection report_Rev1.0", I think it shall be provided to SKB by ALT.
   Instead of this requirement, FXN can provide the S/N list that we proceed with OBA for every shipment.

Page 7,8.
As the previous discussion, FXN doesn't test the below items in the production line
SOC, DRAM, HDMI-CEC, USB, RJ45-LED, MIC Jack-Detection pin, DC Jack-insert, Bluetooth-RF radiation
* I attached the checklist that we provided before.
Need SW members of ALT and FXN to discuss the necessity first.

Page 9.
4.3.3 Check LED => Need your help to revise it based on the comment from Mr. Yoon.
1. We're not able to test "Green light" in OBA station because we don't have right to login into SKB system.
2. We're not able to test "Blue light" in OBA station because there is no "Blue light" scenario under SKB FW.


Page 12.
5.2 We have not implemented the protective film due to cost impaction that needs to discuss first by Steve and Tiffanie.


*Inspection Criteria
I attached our visual inspection for your reference.
Need your help to check first because we're worried that we have to change the design based on your document.

(PM) Sheila Tu

2019-07-25 18:09

developer   ~0002873

Update FXN test spec in the production line.

(ALTech) SH Son

2019-07-26 15:51

developer   ~0002878

Sheila Tu

Here is my feedback.

*Manufacturing Specification
Page 3
 -1. The SKB S/N may not be confirmed at the time of issue of the PO, so ALT will be more review internally. Then let you know.
 -2. ALT will first notice the SW version. , Update the MPA process flow chart attached file
        If the SW version changes, what time should I tell you at least??
 -3. Update the MPA process flow chart attached file
 -4. This report is based on the FXN OBA Plan. This is a basic quality report that the factory must provide to its customers.
If you can not provide this report with S/N list, how do you prove to the customer that you have AQL 1.0 level sampling tested at the factory?

Page 7,8.
Basically, the customer should get a product that has all functions normally. And that is a basic function included in the product, not special test requirements. .
In particular, HDMI-CEC and USB functions are directly used by customers.
- First, discuss FXN internally, decide whether to proceed with these function test yourselves
- But, FXN should be guarantee that not tested items is functionally no problem.

Page 9.
- will update.

Page 12.
-> Ok. I will check it.


*Inspection Criteria
I check this “VISUAL INSPECTION STANDARD PROPOSAL FOR T99X171.00.pdf”. Except for attached pictures, This is the same document as last you sent (CJ Viewing document).
“Inspection Criteria” is based on SKB quality standard. and also referenced the CJ Viewing document.

First, Review the Inspection Criteria with FNX quality manager.
Please let me know which items are hard to apply. after that I will discuss about it with SKB quality manager.

Thanks
SON

(ALTech) SH Son

2019-07-26 16:07

developer  

(ALTech) SH Son

2019-07-26 16:07

developer   ~0002879

Manufacturing Approval Process_rev1.1_draft

(PM) Sheila Tu

2019-07-29 18:58

developer   ~0002883

Page 3
1. We heard from Daniel that SKB issues half-year order at one time.
   And we also heard from your members that SKB decides their serial number range just after they issue the order.
   Therefore, SKB only accepts their required serial number range because they record the range into their system first.
   What difficult will you encounter if you list the serial number range with PO?

2. There is BMT, 3PL test before SKB decides to upgrade any SW FW.
   SKB could decide the implementation timing by PO number after the FW passed by BMT and 3PL.

3. a) We prepare the shipment before production.
   b) As my explanation, the current process is "FXN to ship out after we finish the production. FXN also provide the production document at the same time".
      What's the purpose that ALT requires to review the production documents then approve to ship out?

4. We don't have paperwork in our factory. All items are recorded on our system by digitalization.
   We deal OBA plan with other customers/operators before MP and provide S/N list what we proceed with OBA every shipment.

(ALTech) SH Son

2020-06-29 16:45

developer   ~0003708

HI henry and VN factory members.

Here is update for Eagle AOSP product Manufacturing Specification.
It should be applied from the first production on AOSP product.

Thanks
SON

(ALTech) SH Son

2020-11-20 12:06

developer  

(ALTech) SH Son

2020-11-20 12:06

developer   ~0005082

Update below

1.2 Update for ECO process

(ALTech) SH Son

2023-03-24 10:25

developer   ~0012628

Hi An, Yuri.

Here is updated inspection criteria.
 please find the "7.3 Buy and Sell items" acceptance conditions.


Thanks
SON

Issue History

Date Modified Username Field Change
2019-07-04 13:18 (ALTech) SH Son New Issue
2019-07-04 13:18 (ALTech) SH Son Status new => assigned
2019-07-04 13:18 (ALTech) SH Son Assigned To => (PM) Sheila Tu
2019-07-04 13:18 (ALTech) SH Son File Added: BFX-AT100_Manufacturing Specification_rev0.1.pdf
2019-07-04 13:19 (ALTech) SH Son Issue Monitored: (ALTech) BY Lee
2019-07-04 13:19 (ALTech) SH Son Issue Monitored: (ALTech) JW Kim
2019-07-04 13:19 (ALTech) SH Son Issue Monitored: (ALTech) Philip
2019-07-04 13:19 (ALTech) SH Son Issue Monitored: (ALTech) SB Park
2019-07-04 13:19 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2019-07-04 13:19 (ALTech) SH Son Issue Monitored: (ALTech) SY Yoon
2019-07-04 13:52 (PM) Sheila Tu File Added: inspection.jpg
2019-07-04 13:52 (PM) Sheila Tu Note Added: 0002825
2019-07-15 14:19 (ALTech) SH Son Note Added: 0002832
2019-07-16 11:31 (ALTech) SH Son Tag Attached: MPS-.01
2019-07-16 11:31 (ALTech) SH Son Tag Detached: MPS-.01
2019-07-16 11:31 (ALTech) SH Son Tag Attached: MPS-01
2019-07-24 17:47 (ALTech) SH Son File Added: BFX-AT100_Manufacturing Specification_Rev1.0.pdf
2019-07-24 17:47 (ALTech) SH Son File Added: Attachment#2_BFX-AT100_inspection criteria_Rev01.pdf
2019-07-24 17:47 (ALTech) SH Son File Added: Attachment#3_SN Report.xlsx
2019-07-24 17:47 (ALTech) SH Son File Added: Attachment#4_OBA Inspection report_Rev1.0.pptx
2019-07-24 17:47 (ALTech) SH Son File Added: Attachment#1_Manufacturing Approval Process_rev1.0.pdf
2019-07-24 17:47 (ALTech) SH Son Note Added: 0002861
2019-07-24 17:51 (ALTech) SH Son File Added: OBA Inspection report_Rev1.0.pptx
2019-07-24 17:51 (ALTech) SH Son Note Added: 0002862
2019-07-25 10:19 (ALTech) SB Park Issue Monitored: (PM) Henry Chiou
2019-07-25 12:55 (ALTech) SB Park File Added: Agenda_9K_Product.xlsx
2019-07-25 12:55 (ALTech) SB Park Note Added: 0002866
2019-07-25 18:01 (PM) Sheila Tu File Added: VISUAL INSPECTION STANDARD PROPOSAL FOR T99X171.00.pdf
2019-07-25 18:01 (PM) Sheila Tu Note Added: 0002872
2019-07-25 18:09 (PM) Sheila Tu File Added: Test Specification_check list.xlsx
2019-07-25 18:09 (PM) Sheila Tu Note Added: 0002873
2019-07-26 15:51 (ALTech) SH Son Note Added: 0002878
2019-07-26 16:07 (ALTech) SH Son File Added: Manufacturing Approval Process_rev1.1_draft.pdf
2019-07-26 16:07 (ALTech) SH Son Note Added: 0002879
2019-07-29 18:58 (PM) Sheila Tu Note Added: 0002883
2020-06-29 16:45 (ALTech) SH Son File Added: BFX-AT100_Manufacturing Specification_Rev1.1.docx
2020-06-29 16:45 (ALTech) SH Son File Added: BFX-AT100_inspection criteria_Rev04.pdf
2020-06-29 16:45 (ALTech) SH Son Note Added: 0003708
2020-06-29 16:45 (ALTech) SH Son Assigned To (PM) Sheila Tu => (PM) Henry Chiou
2020-11-20 12:06 (ALTech) SH Son File Added: BFX-AT100_Manufacturing Specification_Rev1.2_Release.pdf
2020-11-20 12:06 (ALTech) SH Son Note Added: 0005082
2021-12-23 16:55 (SW) Jacky Chiang Assigned To (PM) Henry Chiou => (PM) Carey Lu
2021-12-23 16:55 (SW) Jacky Chiang Status assigned => closed
2021-12-23 16:55 (SW) Jacky Chiang Resolution open => fixed
2023-03-24 09:54 (ALTech) SH Son Issue End Monitor: (ALTech) SB Park
2023-03-24 09:54 (ALTech) SH Son Issue End Monitor: (PM) Henry Chiou
2023-03-24 09:54 (ALTech) SH Son Issue Monitored: (ALTech) Hyunsik Kim
2023-03-24 09:54 (ALTech) SH Son Issue Monitored: (ALTech) Lonnie Kim
2023-03-24 09:54 (ALTech) SH Son Issue Monitored: (ALTech) Sophie Lee
2023-03-24 09:54 (ALTech) SH Son Issue Monitored: (ALTech) Sun Choul Joung
2023-03-24 09:54 (ALTech) SH Son Issue Monitored: (MFG) An Tran
2023-03-24 09:54 (ALTech) SH Son Issue Monitored: (MFG) Ben Trinh
2023-03-24 09:54 (ALTech) SH Son Issue Monitored: (MFG) Yuri Ruan
2023-03-24 09:54 (ALTech) SH Son Issue Monitored: (PM) Dennis Lu
2023-03-24 09:54 (ALTech) SH Son Issue Monitored: (PM) Sheila Tu
2023-03-24 09:54 (ALTech) SH Son Issue Monitored: (PM) Tiffanie Lai
2023-03-24 09:54 (ALTech) SH Son Issue Monitored: (Sales) Miya Wang
2023-03-24 09:54 (ALTech) SH Son Assigned To (PM) Carey Lu => (MFG) An Tran
2023-03-24 09:54 (ALTech) SH Son Status closed => feedback
2023-03-24 09:54 (ALTech) SH Son Resolution fixed => reopened
2023-03-24 10:25 (ALTech) SH Son Note Added: 0012628
2023-03-24 10:25 (ALTech) SH Son File Added: BFX-AT100_inspection criteria_Rev05_Release.pdf
2023-03-24 10:25 (ALTech) SH Son Status feedback => assigned
2023-03-27 09:28 (SW) Jacky Chiang Severity s2-severe => s4-minor
2023-03-27 09:28 (SW) Jacky Chiang Description Updated
2023-03-27 09:38 (ALTech) SH Son Relationship added related to 0000814